The purpose of this tool is make it easier to understand the differences between two electrification scenarios.
Tool Arguments
- CSV of Settlements
- Location (Longitude, Latitude)
- Projected Electricity Consumption (kWh / year)
- Projected Electrification Year
- Proposed Electrification Technology
- Proposed Electrification Cost ($)
- Proposed Electrification Net Present Value Cost ($)
- Proposed Electrification Levelized Cost ($ / kWh)
- CSV of Existing Medium Voltage Lines
- WKT
- CSV of Proposed Medium Voltage Lines
- WKT
Result Properties
- Table of Differences
- Map of Differences